Bestuurskunde

Article

De nieuwe Omgevingswet en versnelling van woningbouw: over veranderingen, mogelijkheden en (onjuiste) verwachtingen

Trefwoorden planning law, Acceleration, residential development, the Netherlands, Time
Auteurs Fred Hobma
DOI
Auteursinformatie

Fred Hobma
Mr. dr. F.A.M. Hobma is universitair hoofddocent omgevingsrecht aan de TU Delft.
  • Samenvatting

      Legislation is seen both as a problem and a solution for the lengthy process of spatial decision-making. The new Environment and Planning Act aims to speed up and improve decision-making on spatial projects. That sounds promising as an answer to the housing shortage. Can we indeed expect the Act to speed up housing projects? Will legal problems such as the protracted nitrogen crisis and appeals by opponents of new construction be prevented from now on? To answer these questions, this contribution first examines the (im)possibilities of using the instrument of legislation to tackle (spatial) problems. The subsequent analysis of accelerating measures in the Environment and Planning Act shows that a great deal of time is actually spent on activities that are not affected by legislative measures. High expectations of acceleration should therefore be tempered.

Om de rest van dit artikel te lezen moet u inloggen



Heeft u een registratiecode ontvangen maar nog geen toegang? Activeer dan hier uw code.

Weet u uw wachtwoord niet meer? Nieuw wachtwoord aanvragen.

Toegang tot dit losse artikel kopen

Voor een vast bedrag van € 17,50 (excl. btw) koopt u 24 uur online toegang tot dit artikel. Met deze 24 uur toegang kunt u een artikel online raadplegen en in PDF downloaden en printen.
Per mail ontvangt u een activatiecode waarmee u 24 uur toegang tot het artikel kunt activeren.

24 uur toegang € 17,50 (excl. btw)

Uw aankoop activeren

Heeft u een activatiecode, dan kun u uw product hier activeren.